Metra to launch battery-powered trainsets by Stadler
Chicago commuter rail operator Metra awarded a $154 million contract to Stadler US Inc. for eight FLIRT (Fast Light Innovative Regional Train) battery-powered trainsets. The agency is simultaneously pursuing all-electric locomotives, with plans to evaluate their performance and potential for line flexibility and operational efficiency.
Metra plans to initially deploy the new rolling stock on a 15-mile section of its Rock Island District's Beverly Branch, a 16.4-mile route between Chicago and Blue Island, Ill., notable for its frequent stops. The trains will be able to recharge through regenerative braking, existing 480-volt cables at yards and terminals, or through dedicated charging infrastructure. They are expected to enter service by 2028.
Metra's approach prioritizes real-world testing, portable charging infrastructure and staff upskilling to ensure reliability, safety and sustainability of the new battery systems.
Metra and Stadler will unveil the first of Metra's battery-electric trainsets at an Oct. 5 event.
The unveiling will be part of the American Public Transportation Association's TRANSform conference and Expo set for Oct. 4-7 in Chicago. FLIRT is the first zero-emission battery-electric train, marking a milestone in the sustainable, zero-emission North American passenger rail transportation. Stadler battery-electric trainsets are already in operation in Europe, having made their debut in Germany in 2023.
The battery FLIRT is based on Stadler’s FLIRT platform and uses onboard lithium-ion batteries on non-electrified corridors for zero local emissions. The trains can recharge on existing 480V cabling, as well as through recovering energy through regenerative braking. The train is designed to help transit agencies deploy electric service on routes where traditional electrification may not be economically feasible.
Source: Metra










