CalSTA directs $66.5M in State Rail Assistance to improve commuter and intercity rail
The California State Transportation Agency (CalSTA) awarded $66.5 million in flexible State Rail Assistance (SRA) funding to eight projects that will sustain and strengthen commuter and intercity rail service across California. The largest award, $20 million, will help Metrolink avoid proposed cuts to nearly a third of its service and keep trains running for the Southern California riders who depend on them. The remaining awards support safety, reliability and service improvements from the Capitol Corridor to the Central Coast and San Diego County.
Keeping Southern California’s regional rail running
- Caltrans secured $19,260,408 for Coast Positive Train Control: This project will design and install crucial train safety technology along the Union Pacific Railroad (UPRR) Coast Subdivision between Gilroy and Salinas to improve safety, reliability, and operational efficiency for expanded passenger and freight service on that corridor.
- Capital Corridor Joint Power Authority (CCJPA) secured $4,000,000 for Davis Crossovers and Signals: This project will fund several improvements to the Davis Station on the CCJPA that will reduce delays and improve service times and delivery on the corridor.
- CCJPA secured $3,000,000 for Agnew Siding: This award will construct a siding south of the Santa Clara-Great America Station in Santa Clara County to reduce train delays for Capitol Corridor, Altamont Corridor Express (ACE), Amtrak Coast Starlight, and Union Pacific Railroad (UPRR) freight services and to provide opportunity to store trainsets for additional passenger rail service related to concerts and sporting events at the nearby Levi’s Stadium and other venues in the South Bay.
- Los Angeles – San Diego – San Luis Obispo (LOSSAN) secured $1,000,000 for Corridor Optimization Study: This award will support a comprehensive evaluation of passenger and freight rail operations, infrastructure constraints, and opportunities to improve efficiency and coordination along the LOSSAN Corridor.
- North County Transit District (NCTD) secured $7,316,000 for Operations Assistance through 2028 Los Angeles Olympics: This project will maintain existing service levels to sustain NCTD’s ridership recovery in fiscal year 2028.
- Peninsula Corridor Joint Powers Board (PCJPB) secured $6,000,000 for Signaling and Safety Work: This award will maintain and rehabilitate critical rail infrastructure to ensure the continued safe, reliable, and efficient operation of passenger rail service.
- PCJPB secured $4,000,000 for Battery Electric Multiple Unit (BEMU) Pilot Service: This project award will support Caltrain’s zero-emission commuter train service through an expansion to Gilroy using zero-emission BEMU trains.
- Sonoma-Marin Area Rail Transit District (SMART) secured $2,000,000 for Ward Street At-Grade Pedestrian Crossing Safety: This project will construct a neighborhood at-grade rail crossing near the proposed Healdsburg Station on the SMART rail corridor.
- Southern California Regional Rail Authority (SCRRA) secured $20,000,000 for Operations Bridge through 2028 Los Angeles Olympics: The project will provide two years of operations funding to Metrolink to maintain current service levels through the 2028 Los Angeles Olympics.
Source: CalSTA









