MBTA secures FY 2022 Passenger Ferry Grant to modernize Hingham Ferry dock
Federal Transit Administration (FTA) has awarded the Massachusetts Bay Transportation Authority (MBTA, T) with $6.6 million, the largest award in the nation (tied with the Metropolitan Transportation Authority) under the FY 2022 Passenger Ferry Grant Program. MBTA will utilize the funds for modernization, safety, and accessibility improvements to the Hingham Ferry dock, which provides a key service link between local communities and the Boston Harbor.
With the dock providing service to over half a million passengers annually before the COVID-19 pandemic, the Hingham Ferry Dock Modification Project aims to improve reliability, resiliency, and the customer experience by increasing the capacity of the ferry service while also making it more resilient against severe weather and climate change.
The rehabilitation project will:
- Replace the existing dock with a permanent, fully accessible dock enhanced with a covered gangway and canopy;
- Upgrade lighting, safety, and security systems; and
- Install a generator to provide full backup power to the dock and Hingham Intermodal Center during potential power outages.
The design for the project is expected to be complete by the end of 2023 and construction is expected to begin in 2024.
Source: MBTA









