Hampton Roads Transit invites public to learn about System Optimization Plan
Hampton Roads Transit (HRT) is inviting the public to pop-up events and open houses to learn about its draft System Optimization Plan, a comprehensive initiative to better align service with available resources to deliver a more reliable transit network.
The System Optimization Plan (SOP) explores how HRT can put its limited resources to their best use by reducing low-ridership local bus service and redeploying assets to routes with high ridership demand. The SOP is designed to increase ridership by allocating service where it is most needed, improve reliability by better matching schedules to bus operator and vehicle availability, and make the system more cost effective.
Upcoming events in the first half of March will provide an overview of changes that will result in more frequent and dependable service, improving connections across the region.
The draft SOP proposes eliminating or modifying low-performing or duplicative routes, while redeploying those assets to routes with high ridership demand. HRT will also add up to 10 new zones for its OnDemand Ridesharing service, providing wait times of 15 minutes or less in areas where fixed-route service is eliminated.
One benefit of the plan is to increase the number of regional backbone routes to 13, providing 330,000 more people with access to 15-minute or better service. New stops will be installed at key locations. Under the plan, fewer than 1 percent of current customers will lose access to transit.
The SOP is scheduled to be implemented in phases starting in May 2027 following approval from HRT’s Commission and implementation planning.
Source: HRT










