Amtrak orders eight 10-car Airo trainsets for Northeast Corridor

Image credit: Amtrak

Amtrak has ordered eight high-capacity 10-car Airo trainsets for delivery in 2031, an addition to the 83 trainsets of various configurations already slated to be delivered over the next five years.

The new High Capacity Trainsets will be powered by modernized Siemens ACS64 locomotives at each end. Thus, they will operate only under catenary between Boston and Washington, D.C.

Amtrak’s announcement says 18 of the locomotives will be modernized. The Siemens electric units first entered Northeast Corridor revenue service in 2014, eventually replacing all AEM7 and HHP8 locomotives dating from 1979 and 1998, respectively. “Demand for train travel isn’t slowing down, and neither are we,” interim Amtrak President Byl Herrmann said. “For customers, that means more seats, more availability when travel is busiest, and more chances to find a fare that fits their budget.”

The modernization integrates the trainsets’ “advanced digital connectivity, real-time diagnostics, equipment health monitoring, and predictive maintenance capabilities” with the locomotives’ “Electronically Controlled Pneumatic braking technology, upgraded communications, and operational systems." “Working together, the upgraded locomotives will provide approximately 12.8 megawatts of combined power, enabling efficient operation of 10-car trainsets at speeds up to 125 mph,” Siemens says.

Three semi-permanently coupled Airo trainsets debuted in Amtrak Cascades revenue service at the end of September. Those six-car Pacific Northwest consists operate with a cab car/coach-baggage at one end and a Charger diesel locomotive, either an Amtrak ALC42 or Washington State Department of Transportation SC44, at the other. The other previously ordered Airos are powered by dual-mode locomotives.

Source: Amtrak