City of Mississauga selects HDR, GEI Consultants for Lakeshore BRT project

Image credit: City of Mississauga

The city of Mississauga, Ontario, has selected HDR Inc. and GEI Consultants to head design and contract administration for its Lakeshore Bus Rapid Transit (BRT) project.

The approximately 2 km (1.2 mile) stretch along Lakeshore Road, considered the Lakeshore corridor, extends from East Avenue to Etobicoke Creek in Mississauga. The project aims to create a multi-modal corridor that improves connectivity, supports sustainable growth and expands waterfront access for all users.

To achieve this multi-model transportation goal, the area will be redesigned to into a complete street that will include:

  • A widened roadway
  • Center-running bus lanes
  • Accessible, weather-protected stations
  • New cycle tracks
  • New sidewalks

Below the street, utilities will be engineered to support future development to enable further redevelopment of the Mississauga’s waterfront.

HDR’s role stretches the project's next major stage, including design, procurement of supplies and construction administration and inspection services.

Source: City of Mississauga