Valley Metro South Central LRT Extension Downtown Phoenix Hub to open in June

Image credit: Valley Metro

Valley Metro's South Central Light-Rail Extension Downtown Phoenix Hub will open to passenger service on June 7. The $1.34 billion, 5.5-mile extension will operate between downtown Phoenix along Central and 1st avenues, continuing south to Baseline Road.

The expansion will introduce a two-line rail system intersecting at the new transit hub in downtown Phoenix:

  • A Line, which will operate between Gilbert Road/Main Street in Mesa, Arizona, and the Downtown Hub; and
  • B Line, which will operate between Metro Parkway in northwest Phoenix and Baseline Road/Central Avenue.

Other project features included eight new stations and 14 new trains. Selected as a priority corridor, the project addresses critical transportation needs in an area where 44% of residents have limited or no access to personal vehicles. The extension is expected to add more than 8,000 daily riders to the light rail system, which currently serves about 35,000 boardings per day.

Source: Valley Metro