RTA and Pace collaborate on Far South Halsted Corridor Study for future Pulse BRT
The Regional Transportation Authority (RTA) of Northeastern Illinois and Pace are collaborating on the Far South Halsted Corridor Study, which aims to bring Pulse bus rapid transit (BRT) service to Chicago’s south suburbs.
The project will increase transportation resilience, encourage transit-oriented development (TOD), improve walkability and bicycle access, and develop strategies that prepare the corridor to support improved bus service between the Harvey Transportation Center and the Chicago Heights Transportation Center.
RTA and Pace have collaborated with a consultant team to examine current infrastructure, identify opportunity sites for redevelopment, and determine potential station locations for Pace Pulse service in the corridor.
The Pulse Halsted Line, scheduled to launch in 2027, will serve Pace’s highest-ridership corridor from 95th Street south to Harvey. To prepare for an expansion of the Pulse Halsted Line from Harvey south to Chicago Heights, the RTA and Pace have initiated the Far South Halsted Corridor Study to focus on initial planning for future Pulse service.
The Far South Halsted Corridor Study builds off Pace’s completed plans and studies for this area, including the Pace Pulse Corridor Development Plan and the Harvey TOD Plan. The project aligns with RTA’s regional transit strategic plan, Transit is the Answer.
The project is supported by RTA’s Community Planning program, which provides funding and technical assistance to local governments to foster the growth of sustainable, equitable, walkable, and transit-friendly communities.
Source: Pace










