MARTA seeks input for Bankhead Station Master Plan, Platform Extension Project

Image credit: MARTA

The Metropolitan Atlanta Rapid Transit Authority (MARTA) is seeking input on the Bankhead Station Master Plan to guide urban design elements for transit-oriented development (TOD) at the station site, the Quarry Yards site development, and Westside Park.

This effort will be undertaken in collaboration with the MARTA Bankhead Platform Extension project, which will extend the elevated platform from the existing two-car train consist capacity to an eight-train consist.

The project will also incorporate a new canopy, a new elevator, new escalator, the conversion of the existing “berm” (a small hill of dirt and grass) to an open public community plaza with amenities, and a new station entrance providing access to the station platform above to serve the current commuters and meet the demands of the anticipated increase in ridership due to local development in the area and planned transit-oriented development at the station.

The City of Atlanta and Fulton County are project partners. Gensler is the planning lead, Contente Consulting is the engagement lead; and HNTB is the Infrastructure Design/Project Manager.

Source: MARTA