KC Streetcar receives final streetcar from CAF to open both Extensions
Kansas City’s newest streetcar, #814, from vehicle manufacturer CAF USA, Inc. is the eighth streetcar to arrive for the Main Street and Riverfront Extensions, ultimately connecting the University of Missouri-Kansas City (UMKC) to Berkley Riverfront.
The KC Streetcar vehicles are picking up the numbering where it left off with the 801-806 streetcar series. The new vehicles are numbered 807-814.
CAF, along with Silk Road Transport, delivered KC Streetcar vehicle #814 more than 1,000 miles from Elmira, N.Y. to Kansas City, Missouri. KC Streetcar #814 will undergo shop testing for several weeks before it starts testing on the tracks.
The addition of eight new streetcars is a pivotal step in supporting the expansion of the KC Streetcar system, particularly as it grows beyond its original downtown route to include the Main Street and Riverfront Extensions. These new vehicles are essential to accommodate the increased demand expected with the expanded service area, ensuring that frequency, reliability, and capacity are maintained even as ridership grows.
The acceptance of KC Streetcar #814 is especially significant because it marks the culmination of this fleet expansion. As the last new streetcar to arrive in Kansas City, its arrival symbolizes the readiness of the system to operate at full capacity for the expanded service area.
KC Streetcar #808 is undergoing "burn-in" testing on the route. "Burning in" a streetcar vehicle refers to the testing phase where a streetcar undergoes a period of trial runs to ensure that all systems function properly before it's put into passenger service. During this process, the streetcar is operated on the route without passengers, allowing the CAF and KC Streetcar team to evaluate performance, safety, and reliability.
Some of the evaluations include monitoring how the streetcar handles real-world scenarios like track conditions, signaling systems, and speed limits and verifying that propulsion, braking, doors, HVAC (heating, ventilation, air conditioning), and electrical systems are working as intended. Only after the streetcar has passed these tests and any issues are resolved is it considered ready for passenger service. The burn-in process helps to identify and correct potential problems before the vehicle is relied upon to carry passengers. In November, KC Streetcar #807 started passenger service.
KC Streetcars #809 - #813 are also performing various tests in the Singleton Yard Vehicle Maintenance Facility and on the streetcar route during services hours and overnight. These tests include checks of the braking systems, interior systems such as vehicle leveling, sensors, door mechanisms, onboard digital signage and announcements, and more.
As each new streetcar completes the required testing and becomes certified for service, they will be deployed on the downtown line.
Source: KC Streetcar










