OC Transpo tests Stadler FLIRTs, prepares to replace Alstom LINTs on O-Train Line 2
OC Transpo is testing the FLIRT (Fast Light Intercity and Regional Train) on the Stage 2 O-Train South Extension, to prepare for service on the future expanded Line 2 between Bayview Station and Limebank Station in Riverside South.
Manufactured by Stadler in Switzerland, the FLIRT is twice as long and almost double the capacity of the existing trains on Line 2, LINT manufactured by Alstom.
Features of FLIRT:
- 80 metres long and capacity to carry 420 passengers.
- 8 passenger entrance doors on each side provide easy entry and exit.
- Level boarding with station platforms to permit ease of access.
- Each vehicle will have 8 mobility device designated areas.
- Closed circuit television (CCTV) and onboard audible messages and digital displays
- Diesel powered.
The Stage 2 team is extending platforms at all five existing Line 2 stations and has constructed a new maintenance facility. The seven FLIRTs and six LINTs will undergo maintenance at the new facility.
Source: OC Transpo










