King County Metro (Metro) has provided update on the multi-year program to renew and replace vital infrastructure. The program includes multiple transit maintenance bases and route facility improvements located across various sites in King County. Funding is likely to include a mix of programmed King County local and grant funds.

Most of the program is envisioned to be delivered as bundles and packages of similar projects. Metro has updated project schedules based on changing services requirements and facility conditions.

Bundle 1 – General Infrastructure Improvements: Work will consist of infrastructure improvements including site infrastructure, systems, facilities upgrades and equipment work primarily at operational maintenance bases. Initial project estimates are up to $160 million, subject to validation as planning and design advances.

Projects include underground storage tanks, underground utilities, routine and major equipment replacement, bus lifts, paving, building systems, fire systems, and in-route facilities such as comfort stations. Work will be coordinated with and support upcoming electrification work at several of the bases.

Metro plans to utilize Alternative Project Delivery methods to improve the speed and cost effectiveness of project delivery. Earlier this year, Metro obtained approval for Bundle 1 projects using General Contractor/Construction Manager (GC/CM) delivery. Under GC/CM delivery, the contractor team is hired during design to help with estimating, scheduling, constructability review and subcontracting. Construction is contracted in a second phase near the end of design through a combination of negotiated and competitive contract packages and subcontracts designed to optimize construction, supporting participation by a variety of small and disadvantaged contractors and suppliers.

Metro also plans to procure bus lifts for installation by the GC/CM team at multiple locations. All three contracts are expected to begin selection later this year.

Bundle 2 – SGR Electrical & Trolley Infrastructure: Bundle 2 consists of eight projects focused on electrical infrastructure refurbishment of the trolley bus system. It is expected to include switchgear, medium voltage switches, and substation replacements. Initial project estimates for the eight projects are $58.6 million, subject to validation as planning and design advances.

This work is planned to be delivered through a Progressive Design-Build contract. Under this method, a single design and construction team is hired early in the projects based on qualifications to develop plans and costs. Metro will work with the selected team to identify consulting, supply and construction subcontracting opportunities.

Metro plans to begin selecting a team during 2025. The team will consist of the prime contractor(s) and designer(s) in the initial selection.

Source: King County Metro