The New Jersey Transit (NJ Transit) has started replacing Coast Line’s Raritan River Bridge, a swing bridge, with a new lift bridge. The project is estimated to take six years and cost $595 million, of which $446 million is provided by the Federal Transit Administration (FTA). The bridge, built in 1908, was badly damaged in Hurricane Sandy in 2012. The new bridge will be located just west to the current bridge, further into the river and protected from the sea. It will enable trains to go faster.
The New Jersey Transit (NJ Transit) has started replacing Coast Line’s Raritan River Bridge, a swing bridge, with a new lift bridge. The project is estimated to take six years and cost $595 million, of which $446 million is provided by the Federal Transit Administration (FTA). The bridge, built in 1908, was badly damaged in Hurricane Sandy in 2012. The new bridge will be located just west to the current bridge, further into the river and protected from the sea. It will enable trains to go faster.










